Abstract
Abstract. The scheduling of the Renewable Energy Resources generation units which feed the small loads in the context of micro–grid while considering all the technical constraints can essentially be stated as a Mixed–Integer optimization problem. This paper is the first of two and presents the mathematical formulation of the optimal operation scheduling of a micro–grid with the corresponding small loads considered as a deterministic optimization problem. This problem is formulated as a Mixed–Integer Quadratic Programming model (MIQP) due two types of variables, integer and continuous corresponding to the decision that must be taken into account and the output power respectively, while satisfying all technical constraints minimizing the total marginal power generation cost. This model is solved by a deterministic optimization technique CPLEX–based, and is implemented in General Algebraic Modeling System (GAMS).In the second part, the implementation of the micro–grid power system based on renewable energy resources, which consists of a wind turbine, a solar unit, a fuel cell and two storage battery banks is described. The proposed algorithm presented in this first part is then used as Supervisory Control and Data Acquisition (SCADA) software to control the micro–grid. The SCADA software with Programming Logic Control (PLC)can control the generation units, assuring an optimal global functioning of all equipment, including the loads shedding when necessary, taking into account the maintenance, operation, measurement and control considering all involved costs.